Indoor cellular antennas for high-rises

Our Work

We are officially on-air, thanks to WIN. They did a great job keeping the project on plan dates. Thank you for doing such a great job building and commissioning this system. — AT&T
WIN came out to the building, instead of only talking to me on the phone. They were very personable, and they explained the DAS well to somebody like me who hadn't done that type of project before. They were just more impressive as an organization. — Charlie Moriarty, General Manager at Blue Star Properties
WIN has made a very good impression with us because they found a solution at our building to get AT&T on board. — Tom Irvine, General Manager at Hines Property Management
WIN had the best bid, the best contract, the best installation time frame and the least disruptive implementation plan out of all the proposals we received. — John Lyons, Assistant Vice President and Director of Communications of The Durst Organization
We did quite a few buildings with WIN, and they did a great job. I think they are good people that know what they are doing. — AT&T
WIN really brought a technical capacity to the project. They'd always bring their developers and designers with them to have any kind of conversation. I always felt better about that. - Patrick Bailey, Property Manager at Hines Property Management


See WIN’s DAS projects and other ways we’ve improved in-building cell service for clients across the country.

811 Main

Houston, TX

  • Square feet 974,000
  • Carrier(s) AT&T
  • Funded by Carrier
  • Year Deployed 2013
  • Coverage 95%

Houston, We Have a DAS Solution

BG Group Place, an Energy Star and LEED certified landmark in downtown Houston, needed a connectivity solution to match its distinctive design. WIN designed an active DAS to align with the building's aesthetic requirements — completing installation in just 90 days.

1133 Avenue of the Americas

New York, NY

  • Square feet 1,101,300
  • Carrier(s) Verizon (anchor)
  • Funded by Enterprise
  • Year Deployed 2015
  • Coverage 100%

Renovating Connectivity

This older high-rise needed an active DAS solution as part of a major building renovation. The high-end lobby and high security concerns posed significant challenges during installation. WIN worked directly with all parties on-site to ensure a smooth deployment in just 75 days.

2 N. LaSalle

Chicago, IL

  • Square feet 713,030
  • Carrier(s) Verizon
  • Funded by Carrier
  • Year Deployed 2015
  • Coverage 100%

Connectivity in the Chicago Business District

WIN worked with the building owner and carrier to guarantee connectivity inside this prestigious downtown Chicago building. The active DAS solution covers tenants, as well as the building's retail and mechanical spaces. WIN completed installation within just 90 days.

1 Bryant Park

New York, NY

  • Square feet 2,350,000
  • Carrier(s) Sprint, Verizon, AT&T, T-Mobile
  • Funded by Enterprise
  • Year Deployed 2011
  • Coverage 35%

Coverage for the Bank of America Tower

This high-profile Manhattan skyscraper had several existing DAS networks, but not all of them were working. The property owner hired WIN to organize the equipment, coordinate carrier participation and enhance the building's overall cell coverage — all without installing equipment in the basement. WIN met all of the challenges and completed its part of the installation (remaining coverage was handled by the equipment manufacturer) in just 60 days.

4 Times Square

New York, NY

  • Square feet 1,600,000
  • Carrier(s) AT&T, Verizon
  • Funded by Carrier
  • Year Deployed 2014
  • Coverage 100%

Covering Times Square in No Time

Tenants and lobby visitors of this high-profile Times Square office space needed enhanced cell coverage as soon as possible, due to the New Year's Eve festivities and the Super Bowl in NYC. WIN delivered, implementing a neutral host–capable active DAS solution on an expedited time line. WIN still managed to complete the project in just 30 days. This system was integral to the carrier because it helped offload macro issues for the ball drop in Times Square.

2800 Post Oak

Houston, TX

  • Square feet 1,600,000
  • Carrier(s) AT&T
  • Funded by Carrier
  • Year Deployed 2014
  • Coverage 100%

Upgrading Uptown Houston

The Williams Tower, Houston's tallest building outside of downtown, had a connectivity problem, and WIN delivered a successful solution. WIN designed an active DAS to accommodate the building's non-linear risers and completed installation within 90 days.

200 E. Randolph

Chicago, IL

  • Square feet 3,600,000
  • Carrier(s) AT&T (anchor), Verizon
  • Funded by Carrier
  • Year Deployed 2014
  • Coverage 100%

Covering Chicago's Third-tallest Building

Connectivity inside the Aon Center wasn't a problem — except at lunchtime and after work, when nearby Millennium Park filled with people (and phones). Then, tenants had to compete with the crowd for a cell signal. So WIN worked with the building owner and the carrier to design an active DAS solution to keep tenants connected throughout the day. WIN completed the project in just 90 days and will soon be redesigning the DAS to accommodate a new observation deck.

1155 Avenue of the Americas

New York, NY

  • Square feet 790,000
  • Carrier(s) Verizon
  • Funded by Building
  • Year Deployed 2015
  • Coverage 100%

Aid in Manhattan

This project began when the property owner asked WIN to help enhance coverage inside the building. WIN designed and installed a full neutral-host, scalable active DAS solution to cover the tenants and mechanical spaces. In the building's two-story fan rooms, WIN installed equipment in nontraditional locations — taking measures to allow for easy expansion if additional carriers joined the system. The installation only took 90 days.

111 N. Canal

Chicago, IL

  • Square feet 860,000
  • Carrier(s) Verizon
  • Funded by Carrier
  • Year Deployed 2015
  • Coverage 100%

A Big DAS Solution for Big Names

When Uber, Twitter, Gogo and other big businesses moved to a new space across the street from Ogilvie Transportation Center in Chicago, they needed to know they'd have reliable cell coverage in spite of the area's high data traffic. WIN worked with the building, the carrier and each tenant to develop an active DAS solution that wouldn't detract from the overall aesthetics of the space. Even with the extensive approval process for antenna locations, the installation only took 90 days.

1000 W. Fulton

Chicago, IL

  • Square feet 550,000
  • Carrier(s) Verizon
  • Funded by Carrier
  • Year Deployed 2015
  • Coverage 100%

We've Got Google Covered

When an old cold storage facility in Chicago's historic Fulton Market transformed into a trendy LEED Gold–certified office space, Google moved in. WIN sealed the deal by implementing a state-of-the-art DAS solution to ensure connectivity throughout the building. Multiple lobbies and unique building aesthetics required careful planning and problem-solving. In spite of all the special challenges, the installation took just 100 days to complete.

114 W. 47TH

New York, NY

  • Square feet 658,000
  • Carrier(s) Verizon
  • Funded by Enterprise
  • Year Deployed 2015
  • Coverage 100%

Infrastructure Innovation

This large, older building needed a connectivity upgrade for its high-profile tenants. WIN designed an active DAS specifically to work around the building's existing infrastructure and inconsistent floor layout, which required some creative cable runs. Still, WIN completed the deployment in just 75 days.

Learn More About How We Help